Allbet Gaming

新2开户:Fukushima debris removal delayed by another year

Allbet登录网址 2022年08月28日 体育 2 0

新2开户www.hg108.vip)是一个开放皇冠正网即时比分、新2开户的平台。新2线上开户平台(www.hg108.vip)提供最新皇冠登录,皇冠APP下载包含新皇冠体育代理、会员APP。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

皇冠管理端登3手机www.99cx.vip)实时更新发布最新最快最有效的皇冠管理端登3手机网址,包括新2登3手机网址,新2登3备用网址,皇冠登3最新网址,新2足球登3网址,新2网址大全。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。 Allbet Gaming声明:该文看法仅代表作者自己,与www.allbetgame.us无关。转载请注明:新2开户:Fukushima debris removal delayed by another year
发布评论

分享到:

telegram群成员id采集器(www.tel8.vip):2,636 new Covid cases, 11 deaths
你是第一个吃螃蟹的人
发表评论

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。